Documents TypeFile NameDate ModifiedSize pdf1 01wintroductiontotheapplicant Issued Cymraeg 09/06/2016 4:04 pm1M pdf1 02application Form Issued 09/06/2016 4:04 pm179.2k pdf2 02 Existing Site Location Plan Issued 09/06/2016 4:04 pm4.8M pdf2 03 1 Land Plans Sheet 1 Issued 09/06/2016 4:04 pm867.1k pdf2 03 2 Land Plans Sheet 2 Issued 09/06/2016 4:04 pm405.7k pdf2 03 Land Plans Key Plan Issued 09/06/2016 4:04 pm2.1M pdf2 05 1 Indicative Site Layout Plan Sheet 1 Issued 09/06/2016 4:04 pm517k pdf2 05 2 Indicative Site Layout Plan Sheet 2 Issued 09/06/2016 4:04 pm991.2k pdf2 05 3 Indicative Site Layout Plan Sheet 3 Issued 09/06/2016 4:03 pm430.8k pdf2 05 4 Indicative Site Layout Plan Sheet 4 Issued 09/06/2016 4:03 pm604.5k pdf2 05 5 Indicative Site Layout Plan Sheet 5 Issued 09/06/2016 4:03 pm497.6k pdf2 05 Indicative Site Layout Plan Issued 09/06/2016 4:03 pm1.4M pdf2 06 1 Indicative Elevation Section Q1 Issued 09/06/2016 4:04 pm276.9k pdf2 06 3 Indicative Elevation Section Ex Slate Mounds Issued 09/06/2016 4:04 pm334.8k pdf2 06 4 Indicative Elevation Section Penstock Inlet Outlet Config Issued 09/06/2016 4:04 pm456.9k pdf2 06 5 Indicative Elevation Section Penstock Config Issued 09/06/2016 4:03 pm339.4k pdf2 06 7 Indicative Elevation Section Aboveground Buildings Issued 09/06/2016 4:03 pm337.1k pdf2 06 8 Indicative Elevation Section Tailrace Inlet Outlet Config Issued 09/06/2016 4:04 pm369.7k pdf2 06 10 Indicative Elevation Section Q6 Scour Tower Issued 09/06/2016 4:03 pm353.9k pdf2 06 12 Indicative Elevation Section Pumping Station Spillway Issued 09/06/2016 4:04 pm264.4k pdf2 07 1 Nature Conservation Site Habitats and Diversity Features Issued 09/06/2016 4:03 pm6.7M pdf2 07 3 Water Bodies in a River Basin Management Plan Issued 09/06/2016 4:04 pm6.3M pdf2 09 4 Access Plan Issued 09/06/2016 4:04 pm4.8M pdf2 10 2 Crown Land Plans Sheet 2 Issued 09/06/2016 4:03 pm382.4k pdf2 10 Crown Land Plans Key Plan Issued 09/06/2016 4:04 pm2.1M pdf2 Plans Drawings Sections Contentspage 09/06/2016 4:03 pm239.4k pdf4 02fundingstatement 09/06/2016 4:03 pm303.8k pdf4 04commonaccesslandandprowstrategy 09/06/2016 4:04 pm5.8M pdf5 01 1consultationreportsummary Issued 09/06/2016 4:04 pm613.7k pdf5 01 1wconsultation Report Summary Cymraeg Issued 09/06/2016 4:03 pm1.6M pdf5 01consultationreport Issued 09/06/2016 4:04 pm47M pdf5 02statutorynuisance Issued 09/06/2016 4:04 pm242.3k pdf5 03nosignificanteffectsreport Issued 09/06/2016 4:03 pm816.5k pdf6 01wnon Technical Summary Cymraeg Issued 09/06/2016 4:04 pm12M pdf7 01gridconnectionstatement Issued 09/06/2016 4:03 pm3.5M pdf8 01 Planning Statement Issued 09/06/2016 4:04 pm26.4M pdf8 02wplanning Statement Summary Cymraeg Issued 09/06/2016 4:04 pm883.8k pdf8 03design Access Statement Issued 09/06/2016 4:04 pm12.2M pdf8 03wdesign Access Statement Cymraeg Issued 09/06/2016 4:03 pm14.6M pdf101wintroductiontotheapplicant Issued Cymraeg1 09/06/2016 4:03 pm1M pdf301draftdevelopmentconsentorder1 09/06/2016 4:04 pm703.1k pdf302explanatorymemorandum1 09/06/2016 4:04 pm353.8k pdf404commonaccesslandandprowstrategy1 09/06/2016 4:04 pm5.8M pdf601non Technical Summary Issued1 09/06/2016 4:04 pm4.8M pdf802planning Statement Summary Issued1 09/06/2016 4:04 pm280.1k pdf2041 Worksplans Sheet 1 Issued1 09/06/2016 4:04 pm1.4M pdf2043 Worksplans Sheet 3 Issued1 09/06/2016 4:03 pm1.5M pdf5011consultationreportsummary Issued1 09/06/2016 4:04 pm613.7k pdf150720 Replacement Land During Operation Gr Cl 005 09/06/2016 4:03 pm739.9k pdf151023 Crow Replacement Temp Gr Crow 002 09/06/2016 4:03 pm597k pdf151023 Open Access Map Gr Crow 001 09/06/2016 4:04 pm3M pdf151119 Replacement Land During Construction Gr Cl 004 09/06/2016 4:03 pm982.6k pdf151123 Roadworks on Common Detail Gr Cl 007 09/06/2016 4:04 pm579.6k pdfVol4B Fig 6 4j Viewpt 10 Public Footpath West Llanberis 09/06/2016 4:03 pm2.2M pdfVol4B Fig 6 4l Viewpoint 12 Hebron Station 09/06/2016 4:03 pm2M pdfVol4B Fig 7 1 1 7 1 6 Phase 1 Habitat Maps 09/06/2016 4:03 pm7.8M pdfVol4B Figure 7 4 Fungi 09/06/2016 4:04 pm2.2M pdfVol4B Figure 7 5 Reptiles 09/06/2016 4:04 pm2.1M pdfVol4C Contents Page 09/06/2016 4:04 pm198.2k pdfAreviewofdisturbancedistancesinselectedbirds Guidelinesforscottishheritage2007 09/06/2016 4:04 pm513.3k pdfConwycountyboroughcouncil 09/06/2016 4:03 pm29.9k pdfDenbinghshirecountycouncil 09/06/2016 4:04 pm30.1k pdfEn010072 Glyn Rhonwy Project Update Scoping Meeting Note 09/06/2016 4:03 pm87.5k pdfFromnrwreabstractionlicenceati 08949a 09/06/2016 4:03 pm24.6k pdfGlyn Rhonwy Draft Docs Meeting 15 May Final 09/06/2016 4:04 pm192.2k docxGlyn Rhonwy Flyer 2015 Cym 09/06/2016 4:03 pm312.8k docxGlynrhonwy Update December 2015 for Tom Davidson Daily Post Background 09/06/2016 4:03 pm20.6k docxGlynrhonwy Update June 2015 for Ben Butler Dailypost 09/06/2016 4:04 pm17.8k pdfGlynrhonwypumpedstoragescopingopinionreport1 09/06/2016 4:04 pm3.7M pdfGlynrhonwypumpedstoragescopingreport Redacted 09/06/2016 4:04 pm26M docxGlynrhonwysummaryofdocuments 09/06/2016 4:04 pm43.5k pdfGr Discharge Consent Application Part F2 A001 09/06/2016 4:04 pm345.4k pdfGrdischargeconsentapplicationdischargeconsent Supportingstatement Issued 18012016 S 09/06/2016 4:03 pm4.2M pdfGrdischargeconsentapplicationparta A001 09/06/2016 4:04 pm253.1k pdfGwyneddcouncil 09/06/2016 4:04 pm126k docxGwyneddunitarydevelopmentplan2001fragmentpolicyc6 09/06/2016 4:04 pm17.2k pdfGwyneddunitarydevelopmentplan20012016gudp Inquiry Report 09/06/2016 4:04 pm3.3M pdfJournal 35 Seminar Supply 09/06/2016 4:04 pm3.3M pdfLllanberis an American Report 09/06/2016 4:04 pm4.5M pdfMeeting Note from 16 September Draft Docs Feedback Meeting 09/06/2016 4:03 pm100k docModresponsenov2015 09/06/2016 4:04 pm58.5k pdfNrwabstractionlicensedeterminationdecisiondocument 09/06/2016 4:04 pm198.5k pdfPlanningpermission49 9mwscheme19feb2014 09/06/2016 4:04 pm10.6M pdfPostinquiryproposedmodificationstogudp2008combined Sea and Sa 09/06/2016 4:04 pm1.4M pdfPowyscountycouncil 09/06/2016 4:04 pm35.1k pdfSarin Gas Lettermodresponse 09/06/2016 4:03 pm9.2k docxSummaryofobjectionstosphpumpedstorageschemeatglynrhonwy 09/06/2016 4:03 pm19.8k pdfTechnicaldiscussionofundergroundcableinstallation2009 09/06/2016 4:04 pm43.4k docTheproblemofchemicalweaponsdisposal Rahni2006 09/06/2016 4:04 pm44.5k pdfVol2ach2eia Consultationissued 09/06/2016 4:03 pm186.7k pdfVol2ach4 Projectdescriptionissued 09/06/2016 4:04 pm145k pdfVol2ach5 Policycontextissued 09/06/2016 4:04 pm72.4k pdfVol2ach6 Landscapeissued 09/06/2016 4:03 pm343k pdfVol2ach7ecologyissued1 09/06/2016 4:03 pm917.4k pdfVol2ach8geology Ground Conditionsissued1 09/06/2016 4:03 pm134.8k pdfVol2bch9waterresourcesissued 09/06/2016 4:03 pm337.1k pdfVol2bch10floodriskissued1 09/06/2016 4:03 pm204.2k pdfVol2bch11 Archaeology Culturalheritageissued 09/06/2016 4:03 pm264.5k pdfVol2bch12 Transportissued 09/06/2016 4:04 pm1.8M pdfVol2bch13noise Vibrationissued 09/06/2016 4:03 pm354.8k pdfVol2bch14airqualityissued 09/06/2016 4:04 pm234k pdfVol2bch15 Socio Economicsissued 09/06/2016 4:03 pm289.4k pdfVol2bch16environmentalmanagementissued1 09/06/2016 4:04 pm245.3k pdfVol2bch17cumulativeeffectsissued1 09/06/2016 4:03 pm175.4k pdfVol2bch18scheduleofmitigationissued 09/06/2016 4:04 pm134.9k pdfVol3c Appendix 2 3 Glyn Rhonwy Scoping Report Issued 09/06/2016 4:03 pm26.3M pdfVol3cappendix2 2scopingletter 09/06/2016 4:04 pm13.8M pdfVol3cappendix24sosscopingopinion1 09/06/2016 4:04 pm4.4M pdfVol3d Appendix 2 5a Draft Environmental Statement Nts 09/06/2016 4:03 pm22.9M pdfVol3dappendix2 5ddraftenvironmentalstatementappendices 09/06/2016 4:04 pm121.3M pdfVol3eappendix2 6minutesofgwyneddcouncilandnrwmeetings 09/06/2016 4:03 pm254.3k pdfVol3eappendix2 8nrwcorrespondence 09/06/2016 4:04 pm1.3M pdfVol3eappendix7 6arboricultural Assessment 09/06/2016 4:03 pm17.4M pdfVol3eappendix7 7fungihabitatreport 09/06/2016 4:04 pm7.5M pdfVol3eappendix7 9 09/06/2016 4:03 pm1k pdfVol3eappendix7 9ceptowerconsbatandprotectedspeciessurvey 09/06/2016 4:03 pm3.3M pdfVol3eappendix7 10reptilehabitatreport 09/06/2016 4:03 pm1.1M pdfVol3eappendix7 11breedingbirdreport2013 09/06/2016 4:04 pm9.5M pdfVol3eappendix7 12otterspeciessurvey 09/06/2016 4:03 pm452.2k pdfVol3eappendix7 13cepqbbatreport2011-2012 09/06/2016 4:04 pm1.4M pdfVol3eappendix7 14summerbatreport 09/06/2016 4:04 pm10.2M pdfVol3eappendix7 15batmitgationreport 09/06/2016 4:04 pm13.8M pdfVol3eappendix26minutesofgwyneddcouncilandnrwmeetings1 09/06/2016 4:03 pm254.3k pdfVol3eappendix711breedingbirdreport20131 09/06/2016 4:04 pm9.5M pdfVol3fappendix7 16winterbatreport2014 09/06/2016 4:04 pm8M pdfVol3fappendix7 18batlicence 09/06/2016 4:04 pm35.7M pdfVol3fappendix7 19quarryaquaticreport 09/06/2016 4:04 pm2M pdfVol3fappendix7 20breedingbirdreport2015 09/06/2016 4:04 pm8.1M pdfVol3fappendix719quarryaquaticreport1 09/06/2016 4:04 pm2M pdfVol3g Appendix 8 1 Glyn Rhonwy Report 09/06/2016 4:03 pm114.8M pdfVol3happendix8 3historicalosmaps 09/06/2016 4:03 pm20.7M pdfVol3happendix8 4modletter 09/06/2016 4:03 pm1.8M pdfVol3happendix8 5zetica2015uxodeskstudyreport 09/06/2016 4:04 pm6.3M pdfVol3happendix8 6zeticareportcefndu 09/06/2016 4:04 pm2.1M pdfVol3happendix8 7utilities 09/06/2016 4:04 pm35.3M pdfVol3happendix84modletter1 09/06/2016 4:04 pm1.8M pdfVol3happendix85zetica2015uxodeskstudyreport1 09/06/2016 4:04 pm6.3M pdfVol3iappendix9 1wfdassessment 09/06/2016 4:04 pm12.6M pdfVol3iappendix9 3watersamplingresults2012 09/06/2016 4:04 pm1.8M pdfVol3iappendix10 1floodconsequencesassessment 09/06/2016 4:04 pm5M pdfVol3iappendix11 2archaeologyphotographs 09/06/2016 4:03 pm1.7M pdfVol3iappendix11 3aerialphotographs 09/06/2016 4:04 pm104.7k pdfVol3iappendix12 1accidentlocations 09/06/2016 4:04 pm2.1M pdfVol3iappendix12 2constructiontrafficimpacts 09/06/2016 4:04 pm93.4k pdfVol3iappendix13 2baselinenoisesurvey 09/06/2016 4:04 pm1.8M pdfVol3iappendix15 1labourmarketstatistics 09/06/2016 4:04 pm294.4k pdfVol3iappendix16 1cocp 09/06/2016 4:04 pm9.2M pdfVol3iappendix17 1horizonmeeting 09/06/2016 4:03 pm787.4k pdfVol3iappendix94watersamplingresults20151 09/06/2016 4:04 pm7.6M pdfVol4acontentspage 09/06/2016 4:03 pm199.3k pdfVol4afig4 2indicativeq1layout 09/06/2016 4:03 pm344.2k pdfVol4afig4 3indicativecrosssectionofq1 09/06/2016 4:03 pm102.3k pdfVol4afig4 4indicativesection Q1relief Spillway 09/06/2016 4:04 pm299k pdfVol4afig4 5indicativelayoutofq6andpowerhouse 09/06/2016 4:04 pm431.8k pdfVol4afig4 6indicativecrosssectionq6dam Reservoir 09/06/2016 4:04 pm98k pdfVol4afig4 11indicativesectionofturbinehall Shaft 09/06/2016 4:03 pm219.5k pdfVol4afig4 13indicativesectionofpumpingstation 09/06/2016 4:03 pm146.8k pdfVol4afig4 16constructionroutes 09/06/2016 4:04 pm1.6M pdfVol4afigure1 2orderlimits 09/06/2016 4:03 pm2M pdfVol4afigure3 3snowdonianationalparkdesignation 09/06/2016 4:04 pm2.5M pdfVol4afigure3 5designreview1scopingreport 09/06/2016 4:03 pm1.5M pdfVol4afigure3 7designreview3consultationreview 09/06/2016 4:04 pm2.1M pdfVol4afigure3 10designreview7dcodraftes 09/06/2016 4:04 pm1.5M pdfVol4afigure3 11designreview8dcodevelopment 09/06/2016 4:03 pm1.5M pdfVol4bcontentspage 09/06/2016 4:04 pm198.7k pdfVol4bfig6 2landscapedesignations 09/06/2016 4:03 pm2.2M pdfVol4bfig6 3zoneoftheoreticalvisibility Viewshedmap 09/06/2016 4:03 pm1.7M pdfVol4bfig6 4aviewpoint1snowdon 09/06/2016 4:04 pm2M pdfVol4bfig6 4cviewpoint3glyderfawr 09/06/2016 4:03 pm2M pdfVol4bfig6 4dviewpt4llanberislakerailway 09/06/2016 4:03 pm2.1M pdfVol4bfig6 4eviewpoint5llanberis A4086 09/06/2016 4:03 pm2M pdfVol4bfig6 4fviewpoint6pen Y Llyn 09/06/2016 4:04 pm1.8M pdfVol4bfig6 4gviewpoint7cefn Du 09/06/2016 4:03 pm1.9M pdfVol4bfig6 4hviewpoint8dinorwig 09/06/2016 4:03 pm2M pdfVol4bfig6 4iviewpoint9dolbadarncastle 09/06/2016 4:04 pm1.9M pdfVol4bfig6 4kviewpoint11elidirfach 09/06/2016 4:03 pm2M pdfVol4bfigure7 2treepreservationorders 09/06/2016 4:04 pm2.2M pdfVol4bfigure7 3lichen 09/06/2016 4:03 pm2.1M pdfVol4bfigure7 6statutorydesignatedsites 09/06/2016 4:03 pm2.8M pdfVol4cfigure7 7nonstatutorydesignatedsites 09/06/2016 4:04 pm2.7M pdfVol4cfigure7 8batdesignatedsites 09/06/2016 4:04 pm2.2M pdfVol4cfigure8 1geologicalmap 09/06/2016 4:04 pm3.3M pdfVol4cfigure9 4waterframeworkdirectives 09/06/2016 4:04 pm2.6M pdfVol4cfigure10 1floodriskmap 09/06/2016 4:03 pm2.2M pdfVol4cfigure11 1knownarchaeology 09/06/2016 4:03 pm2.4M pdfVol4cfigure11 2firsted Ord Surveyplan1888 09/06/2016 4:04 pm1.7M pdfVol4cfigure11 4thirded Ord Surveyplan1914 09/06/2016 4:04 pm1.5M pdfVol4dcontentspage 09/06/2016 4:04 pm198k pdfVol4dfig12 1lowloader Catdozer 09/06/2016 4:04 pm605.9k pdfVol4dfig12 5sweptpathanalysisa4086junction 09/06/2016 4:04 pm277.2k pdfVol4efig12 72017basetrafficflows 09/06/2016 4:03 pm230.6k pdfVol4efig13 1noisemonitoringlocations 09/06/2016 4:03 pm1.9M pdfVol4efig13 3powerhouseconstructionnoise 09/06/2016 4:04 pm2.6M pdfVol4efig13 5penstockconstructionnoise 09/06/2016 4:04 pm2.3M pdfVol4efig13 7penstocknightimeconstructionnoise 09/06/2016 4:04 pm2.4M pdfVol4efig14 1airqualityreceptorlocations 09/06/2016 4:04 pm2.4M pdfVol4efig15 1locationoftourismattractions 09/06/2016 4:03 pm2.4M pdfVol4efig15 2publicrightsofway 09/06/2016 4:03 pm2.6M pdfVol4efig15 3constructiondiversions 09/06/2016 4:04 pm2M pdfVol4efig17 1cumulativesites 09/06/2016 4:04 pm2.4M