Documents

TypeFile NameDate ModifiedSize

pdf
1 01wintroductiontotheapplicant Issued Cymraeg 09/06/2016 4:04 pm1M

pdf
1 02application Form Issued 09/06/2016 4:04 pm179.2k

pdf
2 02 Existing Site Location Plan Issued 09/06/2016 4:04 pm4.8M

pdf
2 03 1 Land Plans Sheet 1 Issued 09/06/2016 4:04 pm867.1k

pdf
2 03 2 Land Plans Sheet 2 Issued 09/06/2016 4:04 pm405.7k

pdf
2 03 Land Plans Key Plan Issued 09/06/2016 4:04 pm2.1M

pdf
2 05 1 Indicative Site Layout Plan Sheet 1 Issued 09/06/2016 4:04 pm517k

pdf
2 05 2 Indicative Site Layout Plan Sheet 2 Issued 09/06/2016 4:04 pm991.2k

pdf
2 05 3 Indicative Site Layout Plan Sheet 3 Issued 09/06/2016 4:03 pm430.8k

pdf
2 05 4 Indicative Site Layout Plan Sheet 4 Issued 09/06/2016 4:03 pm604.5k

pdf
2 05 5 Indicative Site Layout Plan Sheet 5 Issued 09/06/2016 4:03 pm497.6k

pdf
2 05 Indicative Site Layout Plan Issued 09/06/2016 4:03 pm1.4M

pdf
2 06 1 Indicative Elevation Section Q1 Issued 09/06/2016 4:04 pm276.9k

pdf
2 06 3 Indicative Elevation Section Ex Slate Mounds Issued 09/06/2016 4:04 pm334.8k

pdf
2 06 4 Indicative Elevation Section Penstock Inlet Outlet Config Issued 09/06/2016 4:04 pm456.9k

pdf
2 06 5 Indicative Elevation Section Penstock Config Issued 09/06/2016 4:03 pm339.4k

pdf
2 06 7 Indicative Elevation Section Aboveground Buildings Issued 09/06/2016 4:03 pm337.1k

pdf
2 06 8 Indicative Elevation Section Tailrace Inlet Outlet Config Issued 09/06/2016 4:04 pm369.7k

pdf
2 06 10 Indicative Elevation Section Q6 Scour Tower Issued 09/06/2016 4:03 pm353.9k

pdf
2 06 12 Indicative Elevation Section Pumping Station Spillway Issued 09/06/2016 4:04 pm264.4k

pdf
2 07 1 Nature Conservation Site Habitats and Diversity Features Issued 09/06/2016 4:03 pm6.7M

pdf
2 07 3 Water Bodies in a River Basin Management Plan Issued 09/06/2016 4:04 pm6.3M

pdf
2 09 4 Access Plan Issued 09/06/2016 4:04 pm4.8M

pdf
2 10 2 Crown Land Plans Sheet 2 Issued 09/06/2016 4:03 pm382.4k

pdf
2 10 Crown Land Plans Key Plan Issued 09/06/2016 4:04 pm2.1M

pdf
2 Plans Drawings Sections Contentspage 09/06/2016 4:03 pm239.4k

pdf
4 02fundingstatement 09/06/2016 4:03 pm303.8k

pdf
4 04commonaccesslandandprowstrategy 09/06/2016 4:04 pm5.8M

pdf
5 01 1consultationreportsummary Issued 09/06/2016 4:04 pm613.7k

pdf
5 01 1wconsultation Report Summary Cymraeg Issued 09/06/2016 4:03 pm1.6M

pdf
5 01consultationreport Issued 09/06/2016 4:04 pm47M

pdf
5 02statutorynuisance Issued 09/06/2016 4:04 pm242.3k

pdf
5 03nosignificanteffectsreport Issued 09/06/2016 4:03 pm816.5k

pdf
6 01wnon Technical Summary Cymraeg Issued 09/06/2016 4:04 pm12M

pdf
7 01gridconnectionstatement Issued 09/06/2016 4:03 pm3.5M

pdf
8 01 Planning Statement Issued 09/06/2016 4:04 pm26.4M

pdf
8 02wplanning Statement Summary Cymraeg Issued 09/06/2016 4:04 pm883.8k

pdf
8 03design Access Statement Issued 09/06/2016 4:04 pm12.2M

pdf
8 03wdesign Access Statement Cymraeg Issued 09/06/2016 4:03 pm14.6M

pdf
101wintroductiontotheapplicant Issued Cymraeg1 09/06/2016 4:03 pm1M

pdf
301draftdevelopmentconsentorder1 09/06/2016 4:04 pm703.1k

pdf
302explanatorymemorandum1 09/06/2016 4:04 pm353.8k

pdf
404commonaccesslandandprowstrategy1 09/06/2016 4:04 pm5.8M

pdf
601non Technical Summary Issued1 09/06/2016 4:04 pm4.8M

pdf
802planning Statement Summary Issued1 09/06/2016 4:04 pm280.1k

pdf
2041 Worksplans Sheet 1 Issued1 09/06/2016 4:04 pm1.4M

pdf
2043 Worksplans Sheet 3 Issued1 09/06/2016 4:03 pm1.5M

pdf
5011consultationreportsummary Issued1 09/06/2016 4:04 pm613.7k

pdf
150720 Replacement Land During Operation Gr Cl 005 09/06/2016 4:03 pm739.9k

pdf
151023 Crow Replacement Temp Gr Crow 002 09/06/2016 4:03 pm597k

pdf
151023 Open Access Map Gr Crow 001 09/06/2016 4:04 pm3M

pdf
151119 Replacement Land During Construction Gr Cl 004 09/06/2016 4:03 pm982.6k

pdf
151123 Roadworks on Common Detail Gr Cl 007 09/06/2016 4:04 pm579.6k

pdf
Vol4B Fig 6 4j Viewpt 10 Public Footpath West Llanberis 09/06/2016 4:03 pm2.2M

pdf
Vol4B Fig 6 4l Viewpoint 12 Hebron Station 09/06/2016 4:03 pm2M

pdf
Vol4B Fig 7 1 1 7 1 6 Phase 1 Habitat Maps 09/06/2016 4:03 pm7.8M

pdf
Vol4B Figure 7 4 Fungi 09/06/2016 4:04 pm2.2M

pdf
Vol4B Figure 7 5 Reptiles 09/06/2016 4:04 pm2.1M

pdf
Vol4C Contents Page 09/06/2016 4:04 pm198.2k

pdf
Areviewofdisturbancedistancesinselectedbirds Guidelinesforscottishheritage2007 09/06/2016 4:04 pm513.3k

pdf
Conwycountyboroughcouncil 09/06/2016 4:03 pm29.9k

pdf
Denbinghshirecountycouncil 09/06/2016 4:04 pm30.1k

pdf
En010072 Glyn Rhonwy Project Update Scoping Meeting Note 09/06/2016 4:03 pm87.5k

pdf
Fromnrwreabstractionlicenceati 08949a 09/06/2016 4:03 pm24.6k

pdf
Glyn Rhonwy Draft Docs Meeting 15 May Final 09/06/2016 4:04 pm192.2k

docx
Glyn Rhonwy Flyer 2015 Cym 09/06/2016 4:03 pm312.8k

docx
Glynrhonwy Update December 2015 for Tom Davidson Daily Post Background 09/06/2016 4:03 pm20.6k

docx
Glynrhonwy Update June 2015 for Ben Butler Dailypost 09/06/2016 4:04 pm17.8k

pdf
Glynrhonwypumpedstoragescopingopinionreport1 09/06/2016 4:04 pm3.7M

pdf
Glynrhonwypumpedstoragescopingreport Redacted 09/06/2016 4:04 pm26M

docx
Glynrhonwysummaryofdocuments 09/06/2016 4:04 pm43.5k

pdf
Gr Discharge Consent Application Part F2 A001 09/06/2016 4:04 pm345.4k

pdf
Grdischargeconsentapplicationdischargeconsent Supportingstatement Issued 18012016 S 09/06/2016 4:03 pm4.2M

pdf
Grdischargeconsentapplicationparta A001 09/06/2016 4:04 pm253.1k

pdf
Gwyneddcouncil 09/06/2016 4:04 pm126k

docx
Gwyneddunitarydevelopmentplan2001fragmentpolicyc6 09/06/2016 4:04 pm17.2k

pdf
Gwyneddunitarydevelopmentplan20012016gudp Inquiry Report 09/06/2016 4:04 pm3.3M

pdf
Journal 35 Seminar Supply 09/06/2016 4:04 pm3.3M

pdf
Lllanberis an American Report 09/06/2016 4:04 pm4.5M

pdf
Meeting Note from 16 September Draft Docs Feedback Meeting 09/06/2016 4:03 pm100k

doc
Modresponsenov2015 09/06/2016 4:04 pm58.5k

pdf
Nrwabstractionlicensedeterminationdecisiondocument 09/06/2016 4:04 pm198.5k

pdf
Planningpermission49 9mwscheme19feb2014 09/06/2016 4:04 pm10.6M

pdf
Postinquiryproposedmodificationstogudp2008combined Sea and Sa 09/06/2016 4:04 pm1.4M

pdf
Powyscountycouncil 09/06/2016 4:04 pm35.1k

pdf
Sarin Gas Lettermodresponse 09/06/2016 4:03 pm9.2k

docx
Summaryofobjectionstosphpumpedstorageschemeatglynrhonwy 09/06/2016 4:03 pm19.8k

pdf
Technicaldiscussionofundergroundcableinstallation2009 09/06/2016 4:04 pm43.4k

doc
Theproblemofchemicalweaponsdisposal Rahni2006 09/06/2016 4:04 pm44.5k

pdf
Vol2ach2eia Consultationissued 09/06/2016 4:03 pm186.7k

pdf
Vol2ach4 Projectdescriptionissued 09/06/2016 4:04 pm145k

pdf
Vol2ach5 Policycontextissued 09/06/2016 4:04 pm72.4k

pdf
Vol2ach6 Landscapeissued 09/06/2016 4:03 pm343k

pdf
Vol2ach7ecologyissued1 09/06/2016 4:03 pm917.4k

pdf
Vol2ach8geology Ground Conditionsissued1 09/06/2016 4:03 pm134.8k

pdf
Vol2bch9waterresourcesissued 09/06/2016 4:03 pm337.1k

pdf
Vol2bch10floodriskissued1 09/06/2016 4:03 pm204.2k

pdf
Vol2bch11 Archaeology Culturalheritageissued 09/06/2016 4:03 pm264.5k

pdf
Vol2bch12 Transportissued 09/06/2016 4:04 pm1.8M

pdf
Vol2bch13noise Vibrationissued 09/06/2016 4:03 pm354.8k

pdf
Vol2bch14airqualityissued 09/06/2016 4:04 pm234k

pdf
Vol2bch15 Socio Economicsissued 09/06/2016 4:03 pm289.4k

pdf
Vol2bch16environmentalmanagementissued1 09/06/2016 4:04 pm245.3k

pdf
Vol2bch17cumulativeeffectsissued1 09/06/2016 4:03 pm175.4k

pdf
Vol2bch18scheduleofmitigationissued 09/06/2016 4:04 pm134.9k

pdf
Vol3c Appendix 2 3 Glyn Rhonwy Scoping Report Issued 09/06/2016 4:03 pm26.3M

pdf
Vol3cappendix2 2scopingletter 09/06/2016 4:04 pm13.8M

pdf
Vol3cappendix24sosscopingopinion1 09/06/2016 4:04 pm4.4M

pdf
Vol3d Appendix 2 5a Draft Environmental Statement Nts 09/06/2016 4:03 pm22.9M

pdf
Vol3dappendix2 5ddraftenvironmentalstatementappendices 09/06/2016 4:04 pm121.3M

pdf
Vol3eappendix2 6minutesofgwyneddcouncilandnrwmeetings 09/06/2016 4:03 pm254.3k

pdf
Vol3eappendix2 8nrwcorrespondence 09/06/2016 4:04 pm1.3M

pdf
Vol3eappendix7 6arboricultural Assessment 09/06/2016 4:03 pm17.4M

pdf
Vol3eappendix7 7fungihabitatreport 09/06/2016 4:04 pm7.5M

pdf
Vol3eappendix7 9 09/06/2016 4:03 pm1k

pdf
Vol3eappendix7 9ceptowerconsbatandprotectedspeciessurvey 09/06/2016 4:03 pm3.3M

pdf
Vol3eappendix7 10reptilehabitatreport 09/06/2016 4:03 pm1.1M

pdf
Vol3eappendix7 11breedingbirdreport2013 09/06/2016 4:04 pm9.5M

pdf
Vol3eappendix7 12otterspeciessurvey 09/06/2016 4:03 pm452.2k

pdf
Vol3eappendix7 13cepqbbatreport2011-2012 09/06/2016 4:04 pm1.4M

pdf
Vol3eappendix7 14summerbatreport 09/06/2016 4:04 pm10.2M

pdf
Vol3eappendix7 15batmitgationreport 09/06/2016 4:04 pm13.8M

pdf
Vol3eappendix26minutesofgwyneddcouncilandnrwmeetings1 09/06/2016 4:03 pm254.3k

pdf
Vol3eappendix711breedingbirdreport20131 09/06/2016 4:04 pm9.5M

pdf
Vol3fappendix7 16winterbatreport2014 09/06/2016 4:04 pm8M

pdf
Vol3fappendix7 18batlicence 09/06/2016 4:04 pm35.7M

pdf
Vol3fappendix7 19quarryaquaticreport 09/06/2016 4:04 pm2M

pdf
Vol3fappendix7 20breedingbirdreport2015 09/06/2016 4:04 pm8.1M

pdf
Vol3fappendix719quarryaquaticreport1 09/06/2016 4:04 pm2M

pdf
Vol3g Appendix 8 1 Glyn Rhonwy Report 09/06/2016 4:03 pm114.8M

pdf
Vol3happendix8 3historicalosmaps 09/06/2016 4:03 pm20.7M

pdf
Vol3happendix8 4modletter 09/06/2016 4:03 pm1.8M

pdf
Vol3happendix8 5zetica2015uxodeskstudyreport 09/06/2016 4:04 pm6.3M

pdf
Vol3happendix8 6zeticareportcefndu 09/06/2016 4:04 pm2.1M

pdf
Vol3happendix8 7utilities 09/06/2016 4:04 pm35.3M

pdf
Vol3happendix84modletter1 09/06/2016 4:04 pm1.8M

pdf
Vol3happendix85zetica2015uxodeskstudyreport1 09/06/2016 4:04 pm6.3M

pdf
Vol3iappendix9 1wfdassessment 09/06/2016 4:04 pm12.6M

pdf
Vol3iappendix9 3watersamplingresults2012 09/06/2016 4:04 pm1.8M

pdf
Vol3iappendix10 1floodconsequencesassessment 09/06/2016 4:04 pm5M

pdf
Vol3iappendix11 2archaeologyphotographs 09/06/2016 4:03 pm1.7M

pdf
Vol3iappendix11 3aerialphotographs 09/06/2016 4:04 pm104.7k

pdf
Vol3iappendix12 1accidentlocations 09/06/2016 4:04 pm2.1M

pdf
Vol3iappendix12 2constructiontrafficimpacts 09/06/2016 4:04 pm93.4k

pdf
Vol3iappendix13 2baselinenoisesurvey 09/06/2016 4:04 pm1.8M

pdf
Vol3iappendix15 1labourmarketstatistics 09/06/2016 4:04 pm294.4k

pdf
Vol3iappendix16 1cocp 09/06/2016 4:04 pm9.2M

pdf
Vol3iappendix17 1horizonmeeting 09/06/2016 4:03 pm787.4k

pdf
Vol3iappendix94watersamplingresults20151 09/06/2016 4:04 pm7.6M

pdf
Vol4acontentspage 09/06/2016 4:03 pm199.3k

pdf
Vol4afig4 2indicativeq1layout 09/06/2016 4:03 pm344.2k

pdf
Vol4afig4 3indicativecrosssectionofq1 09/06/2016 4:03 pm102.3k

pdf
Vol4afig4 4indicativesection Q1relief Spillway 09/06/2016 4:04 pm299k

pdf
Vol4afig4 5indicativelayoutofq6andpowerhouse 09/06/2016 4:04 pm431.8k

pdf
Vol4afig4 6indicativecrosssectionq6dam Reservoir 09/06/2016 4:04 pm98k

pdf
Vol4afig4 11indicativesectionofturbinehall Shaft 09/06/2016 4:03 pm219.5k

pdf
Vol4afig4 13indicativesectionofpumpingstation 09/06/2016 4:03 pm146.8k

pdf
Vol4afig4 16constructionroutes 09/06/2016 4:04 pm1.6M

pdf
Vol4afigure1 2orderlimits 09/06/2016 4:03 pm2M

pdf
Vol4afigure3 3snowdonianationalparkdesignation 09/06/2016 4:04 pm2.5M

pdf
Vol4afigure3 5designreview1scopingreport 09/06/2016 4:03 pm1.5M

pdf
Vol4afigure3 7designreview3consultationreview 09/06/2016 4:04 pm2.1M

pdf
Vol4afigure3 10designreview7dcodraftes 09/06/2016 4:04 pm1.5M

pdf
Vol4afigure3 11designreview8dcodevelopment 09/06/2016 4:03 pm1.5M

pdf
Vol4bcontentspage 09/06/2016 4:04 pm198.7k

pdf
Vol4bfig6 2landscapedesignations 09/06/2016 4:03 pm2.2M

pdf
Vol4bfig6 3zoneoftheoreticalvisibility Viewshedmap 09/06/2016 4:03 pm1.7M

pdf
Vol4bfig6 4aviewpoint1snowdon 09/06/2016 4:04 pm2M

pdf
Vol4bfig6 4cviewpoint3glyderfawr 09/06/2016 4:03 pm2M

pdf
Vol4bfig6 4dviewpt4llanberislakerailway 09/06/2016 4:03 pm2.1M

pdf
Vol4bfig6 4eviewpoint5llanberis A4086 09/06/2016 4:03 pm2M

pdf
Vol4bfig6 4fviewpoint6pen Y Llyn 09/06/2016 4:04 pm1.8M

pdf
Vol4bfig6 4gviewpoint7cefn Du 09/06/2016 4:03 pm1.9M

pdf
Vol4bfig6 4hviewpoint8dinorwig 09/06/2016 4:03 pm2M

pdf
Vol4bfig6 4iviewpoint9dolbadarncastle 09/06/2016 4:04 pm1.9M

pdf
Vol4bfig6 4kviewpoint11elidirfach 09/06/2016 4:03 pm2M

pdf
Vol4bfigure7 2treepreservationorders 09/06/2016 4:04 pm2.2M

pdf
Vol4bfigure7 3lichen 09/06/2016 4:03 pm2.1M

pdf
Vol4bfigure7 6statutorydesignatedsites 09/06/2016 4:03 pm2.8M

pdf
Vol4cfigure7 7nonstatutorydesignatedsites 09/06/2016 4:04 pm2.7M

pdf
Vol4cfigure7 8batdesignatedsites 09/06/2016 4:04 pm2.2M

pdf
Vol4cfigure8 1geologicalmap 09/06/2016 4:04 pm3.3M

pdf
Vol4cfigure9 4waterframeworkdirectives 09/06/2016 4:04 pm2.6M

pdf
Vol4cfigure10 1floodriskmap 09/06/2016 4:03 pm2.2M

pdf
Vol4cfigure11 1knownarchaeology 09/06/2016 4:03 pm2.4M

pdf
Vol4cfigure11 2firsted Ord Surveyplan1888 09/06/2016 4:04 pm1.7M

pdf
Vol4cfigure11 4thirded Ord Surveyplan1914 09/06/2016 4:04 pm1.5M

pdf
Vol4dcontentspage 09/06/2016 4:04 pm198k

pdf
Vol4dfig12 1lowloader Catdozer 09/06/2016 4:04 pm605.9k

pdf
Vol4dfig12 5sweptpathanalysisa4086junction 09/06/2016 4:04 pm277.2k

pdf
Vol4efig12 72017basetrafficflows 09/06/2016 4:03 pm230.6k

pdf
Vol4efig13 1noisemonitoringlocations 09/06/2016 4:03 pm1.9M

pdf
Vol4efig13 3powerhouseconstructionnoise 09/06/2016 4:04 pm2.6M

pdf
Vol4efig13 5penstockconstructionnoise 09/06/2016 4:04 pm2.3M

pdf
Vol4efig13 7penstocknightimeconstructionnoise 09/06/2016 4:04 pm2.4M

pdf
Vol4efig14 1airqualityreceptorlocations 09/06/2016 4:04 pm2.4M

pdf
Vol4efig15 1locationoftourismattractions 09/06/2016 4:03 pm2.4M

pdf
Vol4efig15 2publicrightsofway 09/06/2016 4:03 pm2.6M

pdf
Vol4efig15 3constructiondiversions 09/06/2016 4:04 pm2M

pdf
Vol4efig17 1cumulativesites 09/06/2016 4:04 pm2.4M