Number – Document name – Size – Notes

1.01W – Cyflwyno’r Ymgeisiad – 22 pages – Welsh intro to SPH

1.01 – Introduction to the applicant – 23 pages – Intro to SPH

1.02 – Application form – 11 pages – Actual DCO application

2.0 – Plans, drawings, sections – 3 pages – List of all the plans, drawings and sections

2.01 – Site location plan – 2 pages – Map showing where GR is in North Wales

2.02 – Existing site location plan – 2 pages – Close up map of GR

2.03 – Land plans key plan – 2 pages – Map showing land involved in development

2.03.1 – Land Plans Sheet 1 – 2 pages – Similar to 2.03 map of land involved in development

2.03.2 – Land Plans Sheet 2 – 2 pages – Map of land involved further enlarged

2.04 – Works Plans Key plan – 2 pages – Works plan map index and map of order limits

2.04.1 – Works plans  sheet 1 – 2 pages – As above further enlarged and colour coded

2.04.2 – Works plans sheet 2 – 2 pages – Similar to above

2.04.3 – Works plans sheet 3 – 2 pages – Similar to above

2.05 – Indicative site layout plan – 2 pages – Map with a key as to the type of works and site layout

2.05.1 – Indicative site layout plan sheet 1 – 2 pages – As above, enlarged

2.05.2 – Indicative site layout plan sheet 2 – 2 pages – Similar to above, larger scale

2.05.3 – Indicative site layout plan sheet 3 – 2 pages – Plan of above ground power house

2.05.4 – Indicative site layout plan sheet 4 – 2 pages – Power house, tailrace and Q 6 layout

2.05.5 – Indicative site layout plan sheet 5 – 2 pages – Q6, pumping station and spillway

2.06 – Indicative elevations and section – 2 pages – Indicative Elevations & Section – Q1 Dam, Extent of Evacuation and Reservoir

2.06.2 – Indicative Elevations & Sections of Relief Value and Spillway Infrastructure – 2 pages – Relief valve and spillway infrastructure

2.06.3 – Indicative Elevations & Section of Excess Spoil Mound Near Q1 – 2 pages – Cross sections of slate mounds

2.06.4 – Indicative Elevations & Section of Penstock Inlet / Outlet Configuration – 2 pages – Inlet and outlet layouts

2.06.5 – Indicative Elevations & Section of Penstock Configuration – 2 pages – Cross section and scale of tunnel

2.06.6 – Indicative Elevations & Section of Power House, Turbine Shaft and Turbine House Configuration – 2 pages – Cross section of power house

2.06.7 – Indicative Elevations & Section of Above Ground Power House, Substation and Ancillary Buildings – 2 pages – Cross sections of above ground buildings

2.06.8 – Indicative Elevations & Section of Trailrace Inlet / Outlet Configuration – 2 pages – Cross section of tailrace inlet/ outlet

2.06.9 – Indicative Elevations & Section of Q6 Dam, Extent of Excavation and Reservoir – 2 pages – Dam and reservoir cross sections

2.06.10 – Indicative Elevations & Section of Q6 Scour Tower – 2 pages – Cross section of overflow tower and tunnel

2.06.11 – Indicative Elevations & Section of Pumping Station – 2 pages – Cross section of pumping station

2.06.12 – Indicative Elevations & Section of Pumping Station and Spillway Infrastructure – 2 pages – Pumping station and intake plan and cross sections

2.07.1 – Nature Conservation Site, Habitats and Diversity Features – 2  pages – Map detailing all the environmental and conservation areas within and around the development

2.07.2 – Sites of Landscape Importance – 2 pages – Map showing national park boundary and Dinorwig historic site boundary

2.07.3 – Water Bodies in a River Basin Management Plan – 2 pages – Map showing ‘ecological status’ of the water bodies (streams, lake etc) within and around the development

2.08 – Historic Environment features – 2 pages – Map showing listed monuments and known archaeological features

2.09.1 – Existing rights of way – 2 pages – Map showing footpaths, roads and bridleways

2.09.2 – Rights of way (construction) – 2 pages – Map showing changes to rights of way including permanent closures during construction

2.09.3 – Rights of way (operation) – 2 pages – Map showing affected rights of way during operation of the scheme

2.09.4 – Access plan – 2 pages – Map showing access issues

2.10 – Crown lands key plan – 2 pages – Map showing areas belonging to the crown

2.10.1 – Crown land plan sheet 1 – 2 pages – Enlargement of the above

2.10.2 – Crown land plan sheet 2 – 2 pages – Similar to above

3.01 – Draft development consent order – 47 pages – Looks like the legal document relating to the development of the scheme

3.02 – Explanatory memorandum – 26 pages – Explains all the clauses in 3.01.  Read alongside 3.01

4.01 – Statement of Reasons – 49 pages – Details how landowners were contacted and agreements to purchase the land or compulsorily purchase the land

4.02 – Statement of Funding – 13 pages – Costs associated with various aspects of the development

4.02W – Datganiad Ariannu – 13 pages – Welsh version of 4.02

4.03 – Book of references parts 1 – 5 – 34 pages – Mainly refers to the landowners addresses and details of rights of way

4.04 – Common, Access Land and Public Rights of Way Strategy – 16 pages – Impact on the common land at the site

5.01 – Consultation report – 993 pages – Has an executive summary

5.01.1 – Consultation report summary – 18 pages – Summary of the above

5.01.1W – Addroddiad Ymgynghori  –  crynodeb – 18 pages – Welsh version of the above

5.02 – Statement of respect to statutory nuisance – 19 pages – The nuisance factors during operation and construction and how they will be mitigated

5.03 – No significant effects report – 220 pages – Potential impacts on conservation/ natura sites within 30km of the development

5.04 – Details of other consents and licenses – 10 pages – List of all the environmental and other permits required

6.01 – Environmental statement volume 1 – non – technical summary – 110 pages – Potential environmental impacts and mitigation measures

6.01W – Datganiad Amgylcheddol Cyfrol 1: Crynodeb Annhechnegol – 110 pages – Welsh version of the above

6.02 – Environmental statement – volume 2 – 16 pages – Llst of abbreviations and acronyms used in the environmental statement

6.03 – Environmental statement – volume 3 technical appendices – 20 pages – List of appendices and abbreviations

6.04 – Environmental statement –volume 4 figures and photomontages – 3 pages – List of figures and photomontages used in the ES

7.01 – Grid connection statement – 10 pages – Description of possible grid connection and map of route

8.01 – Planning statement – 145 pages – Planning details and context of the scheme, relevant planning laws and considerations

8.02 – Planning statement summary – 13 pages – Summary of the above

8.02W – Crynodeb o’r Datganiad Cynllunio – 14 pages – Welsh version of the above

8.03 – Design and access statement – 84 pages – Design considerations. Has an executive summary

8.03W – Datganiad Dylunio a Mynediad – 85 pages – Welsh version of the above

8.04 – Glossary – 26 pages – Explanation of terms used

 – Appointment of examining authority – 1 page – Statement of the decision to appoint a single person (Stuart Cowperthwaite) to examine the application (rather than a panel?)

 – Conwy Borough Council – 1 page – Email stating Conwy has no comment on the application

 – Denbighshire Borough Council – 1 page – Email stating Denbighshire has no comment on the application

 – SCOPING OPINION Proposed Glyn Rhonwy Pumped Storage Scheme

– 114 – Report by the UK Planning Inspectorate on the Secretary of State’s opinion on the scoping report initially submitted by SPH

 – SPH Scoping report redacted – 48 pages – SPH’s scoping report to the UK Planning Inspectorate prior to applying for the DCO

 – Late scoping report responses – 17 pages – UKPI’s report on responses received after the deadline

 – Gwynedd Council – 3 pages – Email from Gwynedd on the adequacy of the consultation

 – Notification of decision to accept application – 3 pages – Decision by UKPI to accept the DCO application

 – Post acceptance advice s51 – 2 pages – Re 5 landowners who were not listed in the application and SPH being urged to contact them

 – Powys county council – 1 page – Email from Powys stating no comment

 – Regulation 24 transboundary screening document – 3 pages – Potential cumulative impacts on traffic and pollution by being in proximity to Wylfa power station

 – Section 55 acceptance of applications checklist – 34 pages – Checklist of documents required by UKPI

 – Snowdonia National Park Authority – 1 page – SNPA considers it has been properly consulted

Vol2a ch1 – Environmental statement vol 2 introduction – 14 pages – An introduction to the environmental statement

6.02 Vol2a ch2 – Environmental impact assessment statement approach and consultation – 42 pages – Includes consultation on the environmental impact assessment

6.02 – Vol2a ch3 – Environmental statement – design evolution and alternatives – 35 pages – Design of the scheme

6.02 – vol2a ch 4 – Environmental statement – project description – 42 pages – Description of the various elements of the project

6.02 – vol2a ch5 – Environmental statement – policy context – 25 pages – Relevant policies and guidance

6.02 – vol2a ch6 – Landscape character and visual amenity – 89 pages – Visual and landscape impacts

6.02 – vol2a ch7 – Ecology – 262 pages – Potential impact and mitigation on ecology

6.02 – vol2a ch8 – Geology and ground conditions – 30 pages – Geology of the site

Vol3a – Appendix 1.1 – Town & Country Planning Act: decision notice – 27 pages – Gwynedd council’s planning decision for the smaller scheme and conditions

Vol3b – Appendix 2.1 – 2012 Environmental Statement – 1295 pages – Original environmental statement

Vol3c – Appendix 2.2 – Scoping Letter – 22 pages – Application to Secretary of State requesting a scoping opinion prior to applying for the DCO

Vol3c – Appendix 2.3 – Scoping report – 48 pages – Report to go with the above

Vol3c – Appendix 2.4 – UKPI Scoping Opinion – 159 pages – Report by UKPI on the proposed scheme prior to the DCO application

Vol3d – Appendix 2.5a – Draft Environmental Statement vol1: non technical summary – 85 pages – Preliminary environmental info aimed at the public in supposedly non – technical language

Vol 3d – Appendix 2.5b – Draft Environmental Statement vol 2 – 865 pages – Full version of the above

Vol 3d – Appendix 2.5c – Draft environmental statement figures – 90 pages – List of figures, diagrams , photos, maps etc within the draft ES

Vol 3d – Appendix 2.5d – Draft Environmental statement vol 3 technical appendices – 1287 pages – Various surveys and assessments of the environmental impact

Vol 3e – Appendix 2.6 – Minutes of meetings between Gwynedd council and NRW – 27 pages – Worth reading!

Vol 3e – Appendix 2.7 – Gwynedd Council Correspondance – 22 pages – Correspondence between GC and SPH

Vol 3e – Appendix 2.8 – NRW Correspondance – 38 pages – Correspondence between SPH and NRW

Vol 3e – Appendix 6.1 – ASIDOHL – 27 pages – Assessment of the Significance of the Impact of Development on Historic Landscapes (ASIDOHL) ie Dinorwig

Vol 3e – Appendix 7.1 – AECOM phase 1 habitat report (2013) – 50 pages – Bats, biodiversity and other habitat issues, prepped by the contractor

Vol 3e – Appendix 7.2 – Gritten Ecology 2011 botanical survey   – 28 pages – Plant surveys in the development areas

Vol 3e – Appendix 7.3 – Addendum to Gritten botanical survey 2012 – 11 pages – Additional surveys for areas identified in for temporary construction compounds

Vol 3e – Appendix 7.4 – Addendum to Gritten botanical survey 2012b – 9 pages – Surveys for plants and protected species due to altered spillway and soil storage at q1

Vol 3e – Appendix 7.5 – Etive Ecology (2012) Llyn Padarn Freshwater ecology impact assessment – 58 pages – Impact assessment on arctic charr, floating plantain, lamprey and other freshwater flora and fauna

Vol 3e – Appendix 7.6 – Arboriculture assessment – 42 pages – Trees affected by the scheme

Vol 3e – Appendix 7.7 – Fungi habitat report – 39 pages – Grassland fungi affected by the scheme

Vol 3e – Appendix 7.8 – Lichens habitat report – 15 pages – Lichens affected by the scheme

Vol 3e – Appendix 7.9 – CEP proposed tower construction bat and protected species report – 23 pages – Re bats affected by the scheme and mentions construction of a tower for safety training and equipment testing

Vol 3e – Appendix 7.10 – Reptile habitat report – 20 pages – Reptiles affected by the scheme (lizards and slow worms)

Vol 3e – Appendix 7.11 – Breeding bird report – 31 pages – Birds affected by the scheme

Vol 3e – Appenix 7.12 – Otter survey – 13 pages – Likely otter habitats

Vol 3e – Appendix 7.13 – Bat surveys 2011 – 2012 – 32 pages – More bat surveys

Vol 3e – Appendix 7.14 – Summer bat report – 41 pages –

Vol 3e – Appendix 7.15 – Bat mitigation report – 34 pages – How they could mitigate effects on bats

Vol 3f – Appendix 7.16 – Winter bat hibernation report 2014 – 37 pages –

Vol 3f – Appendix 7.17 – TPO report – 13 pages – Trees with tree protection orders on them within the scheme

Vol 3f – Appendix 7.18 – Bat licence – 93 pages –

Vol 3 f – Appendix 7.19 – Aquatic surveys – 37 pages – Whats in Q 6 and Q 1 water

Vol 3f – Appendix 7.20 – Non confidential breeding bird survey – 47 pages –

Vol 3g – Appendix 8.1 – Hydrogeological report – 63 pages – Geology, hydrology and water resources within the site

Vol 3g – Appendix 8.2 – Borehole logs – 12 pages – Reports on contents of boreholes

Vol 3H – Appendix 8.3 – Historical OS maps – 68 pages – Old OS maps of the site

Vol 3H – Appendix 8.4 – MoD letter – 5 pages – Copy of an old letter from RAF to HTV


 

Vol 3H – 8.5 – Zetica desk study UXO report – 92 pages – Report on possible unexploded ordinance within GR. 

 



Vol 3H – 
Appendix 8.6 – Zetica desk study report UXO Cefn Du – 42 pages – Report on possible unexploded ordinance on Cefn Du

Vol 3H – Appendix 8.7 – Utilities affected and not affected by the development – 76 pages – Impact on local utilities

Vol 3I – Appendix 9.1 – Water Framework Directive assessment – 62 pages – Details water abstraction and discharge details

Note that they will be applying to increase the abstraction rate from 2000m3 to 3300m3 per day

Vol 3I – Appendix 9.2 – Private water supplies letter 2012 – 10 pages – Letter sent to households with private water supplies near the scheme

Vol 3I – Appendix 9.3 – Water sampling results 2012 – 14 pages –

Vol 3I – Appendix 9.4 – Water sampling results 2015 – 311 pages –

Vol 3I – Appendix 9.5 – Private water supplies letter 2015 – 5 pages – Similar to 9.2

Vol 3I – Appendix 10.1 – Flood consequences assessment – 41 pages – Risks of flooding on various areas associated with the scheme

Vol 3I – Appendix 11.1 – Known Archaeology – 23 pages – Archaeological features affected by the scheme

Vol 3I – Appendix 11.2 – Archaeology photographs – 6 pages – Photographs of the above

Vol 3I – Appendix 11.3 – Aerial photographs consulted – 2 pages – List of the photos consulted

Vol 3I – Appendix 11.4 – Written scheme investigation – 22 pages – Archaeological investigation

Vol 3I – Appendix 12.1 – Accident locations by causation factors – 2 pages – Maps of where accidents have occurred in last 4 years

Vol 3I – Appendix 12.2 – Construction traffic impacts – 2 pages – Traffic flows at various junctions

Vol 3I – Appendix 13.1 – Additional noise information – 15 pages – Anticipated onstruction noise levels

Vol 3I – Appendix 13.2 – Baseline noise surveys – 19 pages –

Vol 3I – Appendix 15.1 – Labour market statistics – 5 pages – Local jobs

Vol 3I – Appendix 15.2 – Accommodation survey results 2012 – 25 pages – Accommodation in the area

Vol 3I – Appendix 16.4 – Construction Code of Practice – 144 pages –

Vol 3I – Appendix 17.1 – Minutes of Horizon meeting – 3 pages – Possible cumulative effects of Wylfa construction

Vol 4a – Contents page of figures and photos in the environmental statement – 2 pages –